25 km south Ras Sedr- South Sinai
2003
Wady El- Nile for Construction & Real Estate Development.
Sub-contractor for concrete works (shuttering, bar-bending, concrete pouring, concrete leveling) using Concrete plus scaffolding system and equipment for whole hotel.
40,000,000 EGP
20 months
Wisers Eng. Hassan Abd EI-Reheem
Main building and 2 wings for the Touristic Room, Banquet Hall and Conference Hall. on about 16000 m2 constructed area, 4000 for each wing and 8000 for the main building. Heights vary from 6m till 12m high for the Main Building Lobby, Banquet Hall and Conference Hall. Underground Tunnels to connect buildings together and 3 floors height each regular height 3.8m for the 2 wings. Distillation Plant (Production Building - 500 m3 underground water tankclarifying basin). Power Plant (generator house 800 m2)