RAS SEDR SHERATON
PROJECT LOCATION

25 km south Ras Sedr- South Sinai

PROJECT YEARS OF AWARD

2003

PROJECT MAIN CONTRACTOR

Wady El- Nile for Construction & Real Estate Development.

CONCRETE PLUS ASSIGNMENT

Sub-contractor for concrete works (shuttering, bar-bending, concrete pouring, concrete leveling) using Concrete plus scaffolding system and equipment for whole hotel. 

CONTRACT TOTAL VALUES

40,000,000 EGP

PROJECT SCHEDULE

20 months

PROJECT GENERAL CONSULTANT

Wisers Eng. Hassan Abd EI-Reheem

PROJECT DETAILS

 Main building and 2 wings for the Touristic Room, Banquet Hall and Conference Hall. on about 16000 m2 constructed area, 4000 for each wing and 8000 for the main building. Heights vary from 6m till 12m high for the Main Building Lobby, Banquet Hall and Conference Hall. Underground Tunnels to connect buildings together and 3 floors height each regular height 3.8m for the 2 wings. Distillation Plant (Production Building - 500 m3 underground water tank­clarifying basin). Power Plant (generator house 800 m2)